# | PROJECT | STATUS | CLIENT | GALLERY |
1 | REFURBISHMENT OF TWO ANALYSER SHELTER. INCL SUPPLY OF HVAC AND F&G SYSTEM |
Completed | AR RAZI | |
2 | CHLORINE ANALYZER AND ANALYZER CABINET |
Completed | NATPET | |
3 | DESIGN, SUPPLY , INSTALLATION OF ANALYZER SHELTER |
Completed | AL BAYRONI | |
4 | 2 NOS OF 3 METER SHELTER WITH TOC ANALYSER, PH AND CONDUCTIVITY ANALYSER. |
Completed | INDUSTRIAL PROJECT CO | |
5 | SUPPLY, INSTALLATION AND COMMISSIONING OF 12 CABINET Location : KSA |
Completed | SABIC – PETROKEMYA | |
6 | SUPPLY OF 5.5 METER ANALYZER SHELTER Location : KSA |
Completed | ARAMCO | |
7 | SHELTER MODIFICATION Location : KSA |
Completed | SABIC – AR RAZI | |
8 | SUPPLY OF CABINETS & THREE SIDE SHELTER Location : KSA |
Completed | ARAMCO | |
9 | 10 METER SHELTER |
Completed | NATIONAL PETROCHEMICAL INDUSTRIAL CO | |
10 | SUPPLY OF 4 ANALYSER SHELTERS Location : KSA |
Completed | SAUDI KAYAN | |
11 | 1 SHELTER WITH TOC AND ANALYZER Location : KSA |
Completed | RABIGH | |
12 | 6 TOC CABINETS/ 1 SHELTER WITH GC / TURBIDITY ANALYZER / NETWORKS / 3 SIDED SHELTER Location : KSA |
Completed | SAUDI KAYAN | |
13 | SUPPLY OF 3 NOS OF 3 SIDED SHELTER Location : NIGERIA |
Completed | INTEGRATED TOTAL CONTROL SYSTEM | |
14 | SUPPLY OF FIELD RACK FOR MOUNTING SWAN ANALYZERS Location : KSA |
Completed | SAUDI ARAMCO | |
15 | SUPPLY OF FABRICATED ANALYZER SHELTER (SS 316) Location : OMAN |
Completed | BP GHAZZAN | |
16 | SUPPLY OF SAMPLE CONDITIONING SYSTEM AND 3 SIDED SHELTER FOR MOUNTING ELSTER GC Location : KSA |
Completed | SAUDI ARAMCO | |
17 | SUPPLY OF LIQUID ANALYZERS / ANALYZER SHELTER Location : KUWAIT |
Completed | KOC | |
18 | SUPPLY OF SAMPLE CONDITIONING SYSTEM AND 3 SIDED SHELTER FOR MOUNTING EMERSON GC Location : KSA |
Completed | SAUDI ARAMCO SDAFCO V NATURAL GAS PROJECT | |
19 | DESIGN ENGINEERING AND SUPPLY OF 1 METERING SHELTER & 1 ANALYZERS SHELTER Location : EGYPT |
Completed | AGIBA MELEIHA GAS PLANT | |
20 | SUPPLY OF SAMPLE CONDITIONING SYSTEM AND 3 SIDED SHELTER FOR MOUNTING ELSTER GC |
Completed | PP13 | |
21 | SUPPLY OF TWO(2) ANALYZER SHELTERS WITH PGC SCS AND ASSOCIATED EQUIPMENTS Location : IRAN |
Completed | MAHABAD LLDPE HDPE BUTENE-1 PROJECT | |
22 | SUPPLY OF TWO(2) ANALYZER SHELTERS WITH PGC SCS AND ASSOCIATED EQUIPMENTS Location : IRAN |
Completed | LORESTAN LLDPE HDPE BUTENE-1 PROJECT | |
23 | SUPPLY OF TWO(2) ANALYZER SHELTERS IN SS316 MATERIAL WITH PGCS , FIELD ANALYZERS MOISTURE , O2 , PH , COND ETC TOTAL 50 ANALYZERS |
Completed | KAVIAN OLEFIN PLANT (BPC) PLANT 1 & 2 |